EasyManua.ls Logo

Samsung LH015IAC Series - 4. FRAME installation and cable connection

Samsung LH015IAC Series
146 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
LED R&D Lab(VD)
26
Remove the protective packaging of the rear docking portion.
(1) Open the AL shielding bag of the docking part.
(Fig.1)
(1) Remove the front protection PAD fixed to the docking part. (Fig.2)
(2) Remove the protective FOAM attached to the corner of the four sides of the docking part. (fig.3)
- Remove the tape that holds both materials.
Fig.2 remove EPE PAD
EPE PAD
Fig.3 remove FOAM
FOAM
Fig.1 remove AL shielding bag
AL shielding bag
(To work by lying on a table or packaging material. Caution because it can shock the protruding part when working while standing)
4. FRAME installation and cable connection

Table of Contents

Related product manuals