8.6.42 Maintenance inspection form for 6000hrs
Except daily (10hrs) inspection projects, the following projects also have to nish after running
6000hrs.
1. Engine PTO
Disassemble, inspect and x or replace some parts if required which parts has been worn.………
………............................................................................................................................…….
Check Pin Spindle and Bush ,replace them as required…………………........................…….
2. Hoist cylinder
Disassemble, inspect and x or replace some parts if required which parts has been worn.………
………............................................................................................................................…….
Check Pin Spindle and Bush ,replace them as required…………………........................…….
3. Front, rear ride cylinder
Disassemble, inspect and x or replace some parts if required which parts has been worn.………
………............................................................................................................................…….
Check Pin Spindle and Bush ,replace them as required…………………........................…….
4. Steering connecting-rod gear
Check and x or replace some parts if required which parts has been worn.....………………
5. Steering cylinder
Dismounting ,checking and repair or replace damaged components for the cylinder if requir
ed......................................................................................……............……............................
Check the pins and bearings or replace damaged parts for the cylinder if reqiured...............
6. Oil cooling unit
Disassembly, xing and reassembly…………...………………………………………………….
7. Radiator
Disassembly, xing and reassembly………………...…………………………………………….
Transmission shaft
Check and fix or replace some parts if required which parts has been worn.………….
Check balance.……………………………………………………………………..........………….
9. Body
Replace lining plate as required.............................................……………………………….….
Replace Pin Spindle and Bush as required…........................……………………………….….
10.Rear Axle
Replace a frame, drag link and bush…...........................................………………………...…
11.Transmission
Check fasteners for spray equipment, fasten as required ..................…………………………
12. Clean up the dust on the pin shaft of foot-operated valve,and add the lubricating oil...…
Lubrication and Servicing