EasyManua.ls Logo

Schaerer Siena 1 - Preparing Hot Water (Siena 1); Preparing Hot Water (Siena 2); Preparing Steam (Siena 1)

Schaerer Siena 1
42 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation
User manual SI 2 - EN 61
Version 02 / 06.2005 / REWE www.schaerer.com
Preparing hot water (Siena 1)
All beverages dispensed from the machine are hot!
The temperature indicator
lights up in green.
1. Place a cup under the hot water outlet.
2. Turn the rotary dial (on the right-hand side) to the [ Hot water ]
position.
3. To cancel the dispensing procedure, turn the rotary dial back to its
starting position (centre).
Preparing hot water (Siena 2)
All beverages dispensed from the machine are hot!
The temperature indicator
lights up in green.
1. Place a cup under the hot water outlet.
2. Press the button.
The dispensing procedure is stopped by pressing the button
again.
Preparing steam (Siena 1)
All beverages dispensed from the machine are hot!
Not possible with the Siena 2.
1. Place a cup under the steam outlet.
2. Turn the rotary dial (on the right-hand side) to the [ Steam ] position.
3. To cancel the dispensing procedure, turn the rotary dial back to its
starting position (centre).
4. Remove the cup from under the steam outlet.
5. Clean the steam wand with a paper towel.
If products have been heated or frothed, dispense steam for a brief period
in order to clean the steam outlet of residue.

Table of Contents

Other manuals for Schaerer Siena 1

Related product manuals