GF3000 SERIES INSTALLATION MANUAL
Introduction / Tools and Materials Needed / Contact Info
Introduction / Tools an d Materials Ne eded / Cont act Info
Introduction
This manual covers the complete installation and wiring instructions for the following
GF3000 Series models:
MORTISE:
• GF3000 (Standard model)
• GF3000TRD (Top Rail Door)
• GF3000BRD (Bottom Rail Door)
SURFACE MOUNT:
• GF3000SM (Surface Mount)
• GF3000TJ (Top Jamb)
Tools and Materials Needed Not Included in Box
Whichever model you are installing, you should have all of the following tools on hand:
• Pencil
• Tape Measure
• Hammer
• Center Punch
• Power Drill w/Set of Drill Bits
• Chisel
• Small Sawsall or other metal cutting saw
• Set of Hex (Allen) Wrenches
• Set of Philips Head Screwdrivers
• Electrical Tool Kit (containing: wire cutter/stripper, electrical tape, needle-nose
pliers, etc.)
If you are installing a GF3000BRD, you might also need:
• Pavement Breaker or Demolition Hammer
Contact Information:
Page 4
1-877-671-7011