EasyManua.ls Logo

SEI Industries BAMBI MAX - Maintenance Procedures

Default Icon
118 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Section 6: Troubleshooting and Maintenance
Maintenance Procedures
2016 Bambi MAX Service Manual Models 1518-3542 (Version E) 28
We Engineer Solutions
Maintenance Procedures
In addition to the daily pre-flight inspections as outlined in the operations manual, follow the weekly
inspection procedure for times when the bucket is in continuous use.
Bambi Bucket Weekly Inspection Checklist
1. Check all parts of the system for visible damage or defects.
2. Check for excessive movement in linkage.
3. Check top and bottom valve seals.
PowerFill Weekly Inspection Checklist
1. Clean all debris from the pump motor impellers and debris screen.
2. Assess the function of the pump by running it.
3. Inspect pump impeller for signs of damage, particularly on the leading (lower) edge of the impel-
ler blades.
4. Inspect the one-way flapper valves on the pump exit duct (inside the bucket) for cuts or tears.
5. Inspect the motor conductors for cuts or signs of chafing or wear. Immediately repair any damage
to the conductor cable installation.
6. Ensure each cable connector is securely attached to its cable and free from cracks or damage.
Warning
Disconnect power to the pump motor before performing visual inspection of pump impeller.

Table of Contents

Other manuals for SEI Industries BAMBI MAX

Related product manuals