EasyManua.ls Logo

Shaw SDHmini - Piping Installation Schematic

Shaw SDHmini
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
The SDHmini should be placed on a stable surface prior to connecng to the
sample pipework. Care should be taken to ensure that the sample presented to the
SDHmini is not contaminated with any component that will damage, contaminate
or aect in a way that will impair the units accuracy.
The ow rate, although not crical to the sensor measurement, should be low
enough to avoid abrasion to the sensor surface without being so low as to extend
the SDHmini response me to an unacceptable level. In general, a ow rate of
between 2 and 5 litres/min at normal temperature and pressure will give the right
balance.
The SDHmini is designed to operate at atmospheric pressure with a maximum of
0.3 bar.
3.3 Piping Installaon Schemac
8
MAIN
PROCESS
LINE
1
3
2
4
5
6
7
8
9
a.
b.
The sample point should be on the upper surface of the horizontal
pipe or from a vercal secon of pipe, wherever possible.
The sample tube should run upwards from the sample point. If
this is not possible, then an inspecon port or drain tap should be
installed at the lowest point in the sample system.
Notes

Table of Contents

Related product manuals