Commissioning
8.5 Commissioning with the STARTER commissioning tool
SINAMICS DCM DC Converter
Operating Instructions, 12/2018, A5E34763375A
295
Figure 8-12 Complete setting the interface
Click
to set up a drive unit in the project wizard.
Figure 8-13 Inserting a drive unit