Commissioning
8.5 Commissioning with the STARTER commissioning tool
SINAMICS DCM DC Converter
302 Operating Instructions, 12/2018, A5E34763375A
Figure 8-20 Selecting a power unit
With the fields
and
(2-quadrant operation/4-quadrant
operation), you can filter the list under
:
⇒ Select the corresponding device according to the article number on the rating plate.
⇒ Click
>