Commissioning
4.5 Commissioning with STARTER
CU240S and CU240E Control Units, FW 3.2
Operating Instructions, 03/2009, A5E02440075B AA
65
4.5.3 Starting the general commissioning
Description
● When the final dialog box in the "Going online" section is closed, the text "Offline mode"
in the bottom right of the dialog box changes to "Online mode".
Figure 4-11 Going online with STARTER (example with SINAMICS G120)
● For modular inverters that comprise a Control Unit and Power Module, when first
powered-up and after replacing a control unit or a Power Module, message F0395 is
output. This message is intentional and does not indicate that the inverter is faulty. This
message monitors the individual inverter components (CU and PM) against unauthorized
replacement.
● Select and acknowledge message F0395 that is present as described in the Section
"Initial coupling of the CU and PM".
Note
For information about the symbols used in STARTER, call up the online help. Press
<Shift><F1> and choose the relevant symbol. For example:
● Open the drive unit ( ), by double clicking on the drive object ( )
● Click on "Wizard ..." for the (basic) commissioning, and let the Wizard guide you.