Commissioning
4.5 Commissioning with STARTER
CU240S and CU240E Control Units, FW 3.2
Operating Instructions, 03/2009, A5E02440075B AA
69
● The Project Wizard for the (first) commissioning is concluded with the following summary:
Figure 4-15 Completing commissioning
● Finally, choose "Finish".