EasyManua.ls Logo

Siemens SENTRON PAC2200 - Acquisition of Power Demand

Siemens SENTRON PAC2200
112 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Description
2.3 Averaging measured values
PAC2200
20 Manual, 05/2018, L1V30415167B-02
2.3.1
Acquisition of power demand
Values that can be read out
The PAC2200 measuring device supplies the power demand of the last completed
measuring period:
Mean values for active and reactive power, separately for import and export.
Minimum and maximum active power and reactive power within the last measuring
period.
Length of the measuring period in seconds. The period may be shorter for reasons of
external synchronization.
Time in seconds since the last synchronization or since completion of the last period.
Example
: Period length and length of the measuring period:
Period length: 15 minutes; time of day: 13:03; time in seconds: 180 s.
The following can be calculated from this: The last measuring period ended at 13:00. The
active measuring period will end at 13:15 or in 12 minutes.
Note
The power demand of the last measuring period can only be fetched during the current
measuring period.
Adjustable parameters
Period length in minutes: 1 to 60 min adjustable, default 15 min

Table of Contents

Related product manuals