Commissioning
6
6.1
Overview
Prerequisites
The device has been installed.
The device has been connected in accordance with the possible connection methods.
Steps for starting up the device
1. Apply the measuring voltage
2. Parameterize the device
3. Check measured values
Note
Check the connections
Incorrect connection can result in malfunctions and failure of the device.
Before starting up the PAC2200, check that all connections are correct.
Note
When performing an insulation test of the entire installation with AC or DC, the device should
be disconnected before starting the test.