EasyManua.ls Logo

Siemens SIMOGEAR BA 2030 - Page 40

Siemens SIMOGEAR BA 2030
208 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation
4.8 Removing and installing the protection cover
BA 2030
38 Operating Instructions, 02/2021, A5E37880173A/RS-AM
7. Protect all remaining bare areas with a suitable permanent anti-corrosive agent.
You have now installed the protection cover for operation.
Protection cover (supplied loose)
When using the plastic protection cover for gearbox F49, the cover must first be brought into
the correct shape.
When using the plastic protection cover for other gearboxes, it is not necessary to bring the
cover into the required shape; in this case, start with Point 2.
*
Preset breaking point
Figure 4-4 Preset breaking point for F49
1. F49: Break the cover at the preset breaking point (see diagram)
2. Mount the output shaft.
3. Use a suitable cleaning agent to clean the contact surface of the protection cover ② on the
gearbox.
4. Ensure that the O-ring or flat seal ③ is correctly seated.
5. Screw on the protection cover ② with a tightening torque of 10-15 Nm.
6. Protect all remaining bare areas with a suitable permanent anti-corrosive agent.
You have now mounted the plastic protection cover for operation.

Table of Contents