Commissioning
4.2 Preparing commissioning
Inverter with CU240B-2 and CU240E-2 Control Units
Operating Instructions, 07/2010, FW 4.3.2, A5E02299792B AA
57
Users can access the inverter parameters via the following interfaces
E:4 S C-V3N97875
s
SINAMICS
MICRO MEMORY CARD
6SL3254-0AM00-0AA0
)HOGEXV
23
RQWKH&8
67$57(5YLD
3&FRQQHFWLRQ
NLW
0HPRU\
FDUG
67$57(5YLD
)LHOGEXV
Figure 4-2 Inverter's parameterization interfaces
4.2 Preparing commissioning
Prerequisites: before you start
Before starting the commissioning, you should clarify the following.
Are the factory settings sufficient for your application?
Check which factory settings can be used and which functions need to be changed (see
section Commissioning with factory settings (Page 60)). During this check you will probably
find that the factory
settings only require slight adjustment.
Which motor are you using? [P0300]
A synchronous or induction motor?
The inverters are preset in the factory for applications using 4-pole three-phase induction
motors that correspond to the performance data of the inverter.