EasyManua.ls Logo

Siemens SINAMICS PM240-2 - Page 56

Siemens SINAMICS PM240-2
144 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Connecting-up
5.2 Connecting the line and motor cable at the inverter
Power Module PM240-2
56 Hardware Installation Manual, 01/2017, A5E33294624B AE
You must re-attach the connection covers in order to re-establish the touch protection of the
inverter after it has been connected up.
Connecting DC link or braking resistor
Use the rubber cable gland as shown
in the right-
hand figure for connecting the braking resistor.
Using a sharp knife, cut the cap of the cable gland
corresponding to the diameter of the connection
cable of the braking resistor and establish the co
n-
nections.
An optional shield plate is avail
able as strain relief
for the connection cable of the braking resistor.
Top shield plate - FSD … FSF (Page 106)
The connections for the DC link have not been
r
eleased in the current version.

Table of Contents

Other manuals for Siemens SINAMICS PM240-2

Related product manuals