Torque calculations
All values are theoretical and are calculated making the following assumptions:
1. All bolts are new and material selection is according to EN 1515-1 table 2.
2. Gasket material not exceeding 75 shore A durometer is used between the 󹪞owmeter and
mating 󹪞anges.
3. All bolts are galvanized and adequately lubricated.
4. The values are calculated for use with carbon steel 󹪞anges.
5. Flowmeter and mating 󹪞anges are correctly aligned.
4.8 Potential equalization
To obtain optimum results from the measuring system, the sensor must have the same electrical
potential as the liquid being measured.
This is achieved by means of built-in grounding electrodes.
Figure4-9 Potential equalization with earthing electrodes
Cathodic protected piping
Special attention must be paid to systems with cathodic protection.
WARNING
Use in hazardous area!
Cathodic pipe protection is not allowed in hazardous areas
Installing/Mounting
4.8Potential equalization
SITRANS FMS500
Operating Instructions, 01/2024, A5E52677520-AA 25