3.6 Installation
3.6.1 General installation notes
The following procedures have to be carried out before installing the device:
• Remove all transportation safety devices and protective coverings from the device.
• Ensure that the gaskets have the same diameter as the pipelines.
• Note the correct flow direction for the device. This is indicated by an arrow on the housing of
the measuring sensor.
• On metering points with varying thermal loads, the flowmeters have to be mounted with stress
bolts (DIN 2510).
• Stress bolts or bolts and nuts are not included in the scope of delivery.
• Ensure that the measuring flange is concentrically fitted.
• Note the exact installation length of the measuring device when preparing the metering point.
CAUTION!
Installation, assembly, start-up and maintenance may only be performed by appropriately
trained personnel. The regional occupational health and safety directives must always be
observed.
Figure 3-10: Preparing the metering point
1 Installation length of measuring device + thickness of gaskets.
CAUTION!
The internal diameter of the pipelines, the measuring sensor and the gaskets must match. The
gaskets may not protrude into the flow.
Figure 3-11: Internal diameter
1 Internal diameter connection pipe
2 Internal diameter flange and gasket
3 Internal diameter measuring sensor