EasyManuals Logo

Sime GIULIA SYSTEM 25 User Manual

Sime GIULIA SYSTEM 25
76 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #39 background imageLoading...
Page #39 background image
39
check the pressure on the pressure gauge (5) and if neces-
sary top up until the correct pressure reading appears
close the automatic bleed valve (3)
it is recommended that the condensate trap is filled prior to
fitting the flue, by carefully pouring water into the exhaust
connection.
Refit the front panel of the boiler hooking it on at the top,
pushing it forwards and securing it with the screw (1) which
was removed previously.
6.15.3 EMPTYING operations
Boiler:
loosen the automatic bleed valve (3)
close the heating circuit isolation valves (8) and (9)
connect a rubber hose to the boiler drain valve (7) and open
it
when it has fully emptied, close the drain valve (7)
close the automatic bleed valve (3).
3
8
7
9
Fig. 47

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Sime GIULIA SYSTEM 25 and is the answer not in the manual?

Sime GIULIA SYSTEM 25 Specifications

General IconGeneral
BrandSime
ModelGIULIA SYSTEM 25
CategoryBoiler
LanguageEnglish

Related product manuals