EasyManuals Logo

Simrad SU90 Harbour Acceptance Test

Simrad SU90
62 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #17 background imageLoading...
Page #17 background image
409977/B
17
Visualinspection
Topics
Visualinspectionofthedisplay,page17
VisualinspectionoftheProcessorUnit,page19
VisualinspectionoftheOperatingPanel,page21
VisualinspectionoftheTransceiverUnit,page22
Visualinspectionofthehullunit,page24
EnvironmentalinspectionoftheT ransceiverUnit,page26
MakingsurethatallSU90cablesareproperlyconnected,page27
Visualinspectionofthedisplay
AvisualinspectionoftheSU90displayisrequiredtoverifythattheunithasnotbeen
physicallydamagedduringtheinstallation.
Prerequisites
TheSU90hasbeensetupwithitshardwareunitsconnectedasspeciedintheSU90
Installationmanual.TheSU90isturnedoff.Youneedthefollowingequipment:
Multimeter
Context
ThistestprocedureisonlyapplicablewhenthedisplayisprovidedbyKongsberg
MaritimeasapartoftheSU90delivery.
Procedure
1Makesurethattheunit’sserialnumberhasbeenrecordedinthelistofhardware
items.
2Makesurethatthephysicalinstallationoftheunithasbeencompleted.
Visualinspection

Table of Contents

Other manuals for Simrad SU90

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Simrad SU90 and is the answer not in the manual?

Simrad SU90 Specifications

General IconGeneral
BrandSimrad
ModelSU90
CategorySonar
LanguageEnglish

Related product manuals