NANYTE BEAM Manual
NANYTE BEAM Manual BM-001-A3 / V1.1a Page 13 of 33
Back View
ON/OFF SWITCH
Controls the AC power supply to the system.
FUSE DRAWER
Holds two 240V fuse, with one for spare. For replacement, use 20 x 5 mm 3.15A cylindrical
speed F fuse. RS Part: 537-1155.
IEC INLET
Provides AC input to BEAM through a C13 cable.
TYPE B USB 3.0
Provides digital control and live image stream from BEAM. Note that a USB 3.0 port is required
on the computer. In the event that any lower USB speeds are used, the operating software will
show an error message.
www.simtrum.com