14 Monitoring of the SunnyHomeManager system
SMA Solar Technology AG
Operating manual 111HM-20-BE-en-19
Procedure:
1. Select the desired report in the drop-down list Report configuration.
2. In the field Report date in the area Regenerate report manually, enter the date for which you wish to create
a report, either manually or using the calendar.
3. Select [Generate].
☑ A message that the report has been successfully sent is displayed.