4 Additionally Required Materials and Equipment
SMA Solar Technology AG
Operating manual STP110-60-BE-en-16 17
4 Additionally Required Materials and Equipment
Material or equipment Quan-
tity
Explanation
Profile rail (length: min. 1100 mm, depth: max.
60mm, height: 50mm to 80mm)
2 Required exclusively if the product is
intended to be mounted using a pro-
file rail
Threaded ring (M12) 2 Only required if the product is to be
transported with a lifting gear
Heavy-duty anchor (M10x95) 4 Only required if mounted without pro-
file rails: For mounting the device on a
wall
Ring terminal lugs (M12) 4 To attach to the AC connection cables
Ethanol cleaning agent 1 Used to clean terminal lugs
Protective grease 1 Only required if cable is made of alu-
minum: Used to apply to aluminum
conductor
Network cable 1 To establish communication with the
product
Field-assembly RJ45 connector 2 Only required if self-assembly network
cable is used
Means of transport (e.g., pallet truck) 1 Used to transport packed product to
installation site
Lifting gear 1 Only required if the product is to be
transported with a lifting gear
Utility knife 1 Used to unpack the product
Flat-blade screwdriver (4mm) 1 For loosening the sealing screw on the
attachment bars of the inverter
Phillips screwdriver (PH2) 1 For attaching the connecting rod at
the bracket parts for the mounting
bracket
Tape measure 1 For measuring the distances between
bore holes for mounting
Marker pen 1 For marking the bore holes for mount-
ing
Hammer drill with Ø 12 mm and Ø 14 mm drill
bit
1 For drilling the bore holes for mount-
ing
Spirit level 1 For aligning the mounting bracket