1) PV generation ~= LOAD consumption (
Δ
ME3000SP will stay in Standby state.
2) PV generation > LOAD consumption, the surplus power
will be stored in the battery.
3) When the battery is full(or already at Max Charge
Power), excess power will be exported to the grid.
4) PV generation < LOAD consumption, ME3000SP will
discharge the battery to supply power to load,
5) If PV generation + Battery < LOAD consumption,
ME3000SP will import power from the grid.
6) Press “DOWN” button to check current detailed
information, press “UP” to get back to main interface.