HANDLING AND SAFETY INSTRUCTIONS
SolarEdge Installation Guide – MAN-01-00057-2.2
WARNING!
The cover must be opened only after shutting off the inverter ON/OFF switch located at the bottom
of the inverter. This disables the DC voltage inside the inverter. Wait five minutes before opening the
cover. Otherwise, there is a risk of electric shock from energy stored in the capacitors.
WARNING!
Before operating the inverter, ensure that the AC power cable and wall outlet are grounded properly.
WARNING!
Opening the inverter and repairing or testing under power must be performed only by qualified
service personnel familiar with this inverter.
WARNING!
Do not touch the PV panels or any rail system connected when the inverter switch is ON, unless
grounded.
CAUTION:
This unit must be operated under the specified operating specifications, as described in the latest
technical specification datasheet, available on the SolarEdge website at
http://www.solaredge.com/groups/products/overview.
CAUTION:
The inverters are IP65 rated. Unused connectors and glands should be sealed with the provided
seals.
NOTE:
Use PV modules rated according to IEC 61730 class A.
NOTE:
The symbol appears at grounding points on the SolarEdge equipment. This symbol is also
used in this manual.
The following warning symbols appear on the inverter warning label:
Risk of electric shock from energy stored in the capacitor. Do not remove cover
until 5 minutes after disconnecting the all sources of supply.
Hot surface – To reduce the risk of burns, do not touch.