Figure 4.9 Grounding Terminal on Heat-Sink
An external ground connection is provided at the right side of the inverter.
Prepare OT terminals: M4. Use proper tooling to crimp the lug to the terminal.
Connect the OT terminal with ground cable to the right side of the inverter.
The torque setting is 20 in-lbs (2Nm).
External ground connection point
Figure4.10Connect the External Grounding Conductor
4. Installation
User Manual
17