3.1 Environmental considerations
3.1.1 Location selection for the inverter
When selecting a location for the inverter, consider the following:
● The temperature of the inverter heat-sink can reach 167°F.
● The ambient temperature and relative humidity should meet the following requirements.
● If multiple inverters are installed on site, a minimum clearance of 30 inches should be kept
between each inverter and all other mounted equipment. The bottom of the inverter should be
at least 20 inches above of the ground or floor (see Figure 3.1 and 3.2).
● The LED status indicator lights and the LCD located on the inverter's front panel should not be
blocked.
● Adequate ventilation must be present if the inverter is to be installed in a confined space.
WARNING: Risk of fire
Despite careful construction, electrical devices can cause fires.
Do not install the inverter in areas containing highly flammable materials or
gases.
Do not install the inverter in potentially explosive atmospheres.
3. Installation
11
CAUTION, HOT SURFACE CAUTION, HOT SURFACE
● The load bearing structure shall meet the following requirements.
Made of non-inflammable materials
Max. load bearing capacity ≥ 4
times of inverter weight