EasyManua.ls Logo

Sonel MPI-520 - Page 19

Sonel MPI-520
72 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
MPI-520 OPERATING MANUAL version 3.4
17
Checking effectiveness of protection against electric shock of the meter housing in
case of: a) TN network b) TT network
0
a)
b)
L PE
The meter is
ready for meas-
urement.
Make measurement by pressing START
push-button.
Read out the re-
sult.
The result is displayed on the screen for 20s.
The result can be recalled by pressing ENTER push-button.
Remarks:
- Double lead measurement is possible when a test lead other that the lead with a mains socket is se-
lected.
- Remaining issues connected with the measurements as well as the messages displayed are the
same as those described for measurements in L-N circuit or L-L circuit.

Table of Contents

Other manuals for Sonel MPI-520

Related product manuals