EasyManuals Logo

Sonel MPI-520 User Manual

Sonel MPI-520
72 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #36 background imageLoading...
Page #36 background image
MPI-520 OPERATING MANUAL version 3.4
34
Press START push-buttons to start measurement. First,
checking of voltages on particular pairs of wires is per-
formed.
If any of the voltages exceeds allowable voltage, the
symbol of this voltage with “!mark is displayed (e.g. U
N-
PE
!) and the measurement is interrupted.
Read out the results.
Groups of results displayed
are changed by means of
F3 and F4 push-buttons.
Remarks:
- Remarks and messages the same as in point 3.7.1.
3.7.3 Measurements by means of leads with UNI-Schuko outlet plug (WS-03
and WS-04)
Set the rotary switch of function selection at
R
ISO
position.
WS-03
Connect WS-03 lead or WS-04
lead with UNI-Schuko outlet plug.
The meter detects this fact auto-
matically and changes the appear-
ance of the screen.

Table of Contents

Other manuals for Sonel MPI-520

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Sonel MPI-520 and is the answer not in the manual?

Sonel MPI-520 Specifications

General IconGeneral
BrandSonel
ModelMPI-520
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals