EasyManua.ls Logo

Sonel MPI-520 - Measurement of Insulation Resistance; Double-Lead Measurement

Sonel MPI-520
72 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
MPI-520 OPERATING MANUAL version 3.4
30
Remarks:
- The measurement is interrupted, if during measurement of U
B
/R
E,
RCD has been triggered at 0.5I
n
current or if RCD has not been triggered in other cases or if a preset value of safe voltage U
L
has
been exceeded.
- Store the result in the memory (see point 4.1) or press ESC push-button and display only network
voltage and frequency.
- Remaining remarks and information are the same as for I
A
and Z
L-PE
measurement.
3.7 Measurement of insulation resistance
WARNING:
The object tested must not be live.
3.7.1 Double-lead measurement
Set the rotary switch of function selec-
tion at R
ISO
position.
Press F1 push-button and
move to selection of test voltage U
N
.
Select an appropriate item by means of
and
push-buttons and confirm
by pressing
ENTER.
Connect test leads according to the drawing.

Table of Contents

Other manuals for Sonel MPI-520

Related product manuals