2. If SET was pressed for a longer time then the inverter
restarts anew and synchronises itself with the grid.
8.8 Switching on the DC supply
Set the DC circuit breaker on the inverter to position I (Fig. 8).
After testing via the internal MSD (approx. 2 minutes), the feed-in power can be shown on the
display (assuming that sunlight is present).
Fig. 8: Set the DC circuit breaker on the inverter to position I