EasyManua.ls Logo

Sun Microsystems BLIZZARD Qtech III - Vacuum Procedure Execution

Sun Microsystems BLIZZARD Qtech III
903 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTRUCTIONS MANUAL
-44-
Connect and open the coupling connected to the A/C system, then press OK to start the
vacuum phase, press BACK to return back.
When time of check is reached, the machine will test for leaks in the A/C system:
(WARNING! If vacuum time is lower than 15 minutes this test is not reliable). If leaks are
found, the machine will stop automatically and display the A/C SYSTEM LEAKS alarm.
Detection of micro-leaks is not guaranteed.
At the end of the preset vacuum time, the machine will sound and alarm and the following
screen will be displayed:
Close and disconnect HP and LP coupling from A/C system, then press OK to return to the
MAIN MENU; VACUUM PROCEDURE is now successfully completed.
R134a MANUAL PROCEDURE
VACUUM – OPERATION COMPLETED
Close and disconnect HP and LP coupling from A/C system
and press OK
Connect and open HP and LP coupling to A/C
system press OK
R134a MANUAL PROCEDURE
VACUUM
R134a MANUAL PROCEDURE
VACUUM
R134a MANUAL PROCEDURE
VACUUM
x:xx
CHECK LEAKS

Table of Contents