EasyManua.ls Logo

Sun Microsystems BLIZZARD Qtech III - Mixture Test Execution

Sun Microsystems BLIZZARD Qtech III
903 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTRUCTIONS MANUAL
-58-
The mixture (N
2
+H
2
) will be injected into the A/C system, the test will start as soon as the
pressure is stable:
Check for leaks on the connections of the A/C system using a leak detector, then press OK to
continue. The machine will discharge the mixture:
then the machine will sound and alarm and the following screen will be displayed:
Disconnect coupling, then press OK the following screen will be displayed:
R134a DEVICES
N2+H2 TEST
N2+H2 INJECTION
N2+H2 pressure
x.x bar(rel)
Check for leaks on the
connections of the A/C system
using a leak detector
and press OK
R134a DEVICES
N2+H2 TEST
R134a DEVICES
N2+H2 TEST
N2+H2 discharge…
Disconnect N2+H2 coupling
and press OK
R134a DEVICES
N2+H2 TEST
Close and disconnect HP and LP coupling from A/C
system and press OK
R134a DEVICES
N2+H2 TEST

Table of Contents