63
step 4 Stack the OT terminals on the OT/DT terminal of the AC cables, and fix the cables to corre-
sponding terminals.
The tracking power cable can be installed in any two phases of L1/L2/L3.
step 5 Close the protection cover. Close the wiring compartment and tighten the two screws on its
front cover with supplied Allen wrench.
- - End
User Manual 5 Electrical Connection