EasyManua.ls Logo

Suzuki 125 - Ckp Sensor Inspection; Ckp Sensor Removal and Installation; Iap;Tp;Iat Sensor Inspection; Et Sensor Inspection

Suzuki 125
107 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
RV125K7 (’07-MODEL) 79
SENSORS
CKP SENSOR INSPECTION
The crankshaft position sensor is installed in the generator
cover. (Page 44)
CKP SENSOR REMOVAL AND INSTALLATION
• Remove the generator cover. (RV125K3 3-14)
• Install the generator cover in the reverse order of removal.
IAP/TP/IAT SENSOR INSPECTION
The intake air pressure sensor/throttle position sensor/intake air
temperature sensor are combined into one and installed in the
throttle body. (Page 47, 52 and 61)
ET SENSOR INSPECTION
The engine temperature sensor is installed in the cylinder.
(Page 57)
• Remove the ET sensor. (Page 80)
• Check the ET sensor by testing it at the bench as shown in
the figure. Connect the ET sensor 1 to a circuit tester and
place it in the oil 2 contained in a pan, which is placed on a
stove.
• Heat the oil to raise its temperature slowly and read the col-
umn thermometer 3 and the ohmmeter.
Do not attempt to remove the IAP/TP/IAT sensor from
the throttle body. It is available only as a throttle body
assembly.

Table of Contents