EasyManua.ls Logo

Suzuki DR-Z125L - Engine Reinstallation

Suzuki DR-Z125L
222 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3-6 ENGINE
ENGINE REINSTALLATION
Reinstall the engine in the reverse order of engine removal.
Install the engine mounting bolts and nuts as shown in the following illustration.
Tighten the engine mounting nuts to the specified torque.
NOTE:
The engine mounting nuts are self-locking. Once the nuts have been removed, they are no longer of any
use.
Tighten the swingarm pivot nut to the specified torque.
" Swingarm pivot nut: 65 N·m (6.5 kgf-m, 47.0 lb-ft)
Tighten the engine mounting bracket nuts to the specified
torque.
" Engine mounting bracket nut:
40 N·m (4.0 kgf-m, 29.0 lb-ft)
ITEM N·m kgf
.
m lb-ft
A
40 4.0 29.0
B
40 4.0 29.0
C
40 4.0 29.0
@

Table of Contents

Related product manuals