EasyManua.ls Logo

Suzuki DR-Z125L - Reassembly and Remounting

Suzuki DR-Z125L
222 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5-40 CHASSIS
REAR SHOCK ABSORBER
Inspect the rear shock absorber and bushing for damage and oil
leakage. If any damages are found, replace the rear shock
absorber with a new one.
#
SWINGARM PIVOT SHAFT
Measure the pivot shaft runout using the dial gauge. If the runout
exceeds the service limit, replace the pivot shaft.
" 09900-20607: Dial gauge
09900-20701: Magnetic stand
09900-21304: V-block
$ Swingarm pivot shaft runout
Service limit: 0.6 mm (0.02 in)
REASSEMBLY AND REMOUNTING
Reassemble and remount the rear swingarm and suspension in
the reverse order of removal and disassembly. Pay attention to
the following points:
SWINGARM BUSHING
Apply SUZUKI SUPER GREASE A to the spacers, dust
seals and swingarm bushings before installing.
% 99000-25030: SUZUKI SUPER GREASE “A” (USA)
99000-25010: SUZUKI SUPER GREASE “A” (Others)
Press the swingarm bushings into the swingarm pivot by
using the special tool and suitable size socket wrench.
" 09924-84521: Bearing installer
NOTE:
Press the swingarm bushings at 8 mm (0.3 in) depth from the
swingarm edge.
Do not attempt to disassemble the rear shock
absorber. It is unserviceable.

Table of Contents

Related product manuals