EasyManua.ls Logo

Suzuki GSX-R1000 2007 - Page 329

Suzuki GSX-R1000 2007
549 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7-16 COOLING AND LUBRICATION SYSTEM
Install the water pump.
NOTE:
Set the water pump shaft end ' to the oil pump shaft ( as
shown.
Tighten the water pump mounting bolts to the specified
torque.
" Water pump mounting bolt: 10 N·m (1.0 kgf-m, 7.0 lb-ft)
NOTE:
Pass the gear position switch lead wire under the water pump
lib.
Connect the water hoses. (10-20)
Install the engine sprocket cover.
Install the gearshift lever. (10-34)
Pour engine coolant. (2-18)
Pour engine oil. (2-12)
Install the under cowlings. (8-5)
8 N·m
(0.8 kgf-m,
6.0 lb-ft)

Table of Contents

Related product manuals