EasyManua.ls Logo

Swann AMI Powercon - Maintenance; Maintenance Schedule and Sensor Care

Swann AMI Powercon
96 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
AMI Powercon
Maintenance
A-96.250.341 / 061015 43
6. Maintenance
WARNING
Stop operation before maintenance.
Stop sample flow.
Shut off power of the instrument.
6.1. Maintenance Schedule
Preventive maintenance frequency depends on water quality, on
the application, and on national regulations.
Control of certain set-point: Swimming pools, sanitary water:
Reagent
consumption
A 1 l resin bottle, delivered by Swan lasts at 1 ppm alcalizing re-
agent (pH 9.4) for:
4 months at sample flow 10 l/h
5 months at sample flow 5 l/h
6.2. Stop of Operation for Maintenance
1 Stop sample flow.
2 Shut off power of the instrument.
Monthly
Check sample flow.
If the monitoring of resin has been switched off:
Check cation exchanger resin. The resin color
changes to red/orange if exhausted.
If required
clean conductivity sensors
Replace filter
Replace deaeration tubes

Table of Contents

Related product manuals