EasyManua.ls Logo

Swann AMI Powercon - Completion of the Measurement

Swann AMI Powercon
96 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
AMI Powercon
Maintenance
A-96.250.341 / 061015 57
If QA-Check is not successful it is recommended to clean the sen-
sor, see Maintenance of the Sensor, p. 44. If QA-Check fails again
contact your local SWAN distributor for support.
6.8.5 Completion of the measurement
1 Stop the sample flow to the AMI Powercon by closing the appro-
priate valve, e.g. back pressure regulator, sample preparation
or flow regulating valve at flow cell again.
2 Close flow regulating valve of the AMI Inspector.
3 Disconnect the AMI Inspector by removing the tubes and con-
nect the sample outlet of the Monitor AMI Powercon to the sam-
ple outlet funnel again.
4 Start sample flow again and regulate sample flow.
5 Shutdown AMI INSPECTOR Conductivity.
For longer stop of operation see manual of AMI INSPECTOR Con-
ductivity

Table of Contents