1-2
RCD is required to be in compliance with the protection norm of B-type leakage
current.
Please check and test emergency stop circuits after wiring. (Installer is responsible
for the correct wiring.)
Never touch any of the input or output power lines directly or allow any input of
output power lines to come in contact with the inverter case.
Do not perform a dielectric voltage withstand test (megger) on the inverter this
will result in inverter damage to the semiconductor components.
Caution
The line voltage applied must comply with the inverter’s specified input
voltage.
Connect braking resistor and braking unit to the designated terminals.
Do not connect a braking resistor directly to the DC terminals P (+) and N (-),
otherwise fire may result.
Use wire gauge recommendations and torque specifications.
Never connect input power to the inverter output terminals U/T1, V/T2, W/T3.
Do not connect a power factor correction capacitor or surge suppressor to the
inverter output.
Ensure the interference generated by the inverter and motor does not affect
peripheral devices.
Danger
When the momentary power loss is longer than 2 seconds, the inverter will not
have sufficient stored power for its control circuit. Therefore, when the power is
re-applied, the run operation of the inverter will be based on the setting value of
parameter 00-02(or 00-03) and 07-04 status of external run switch.
When the momentary power loss is shorter, inverter still can control the power.
Therefore, when the power is re-applied, the run operation of inverter will be
based on the setting value of parameter 07-00.
When the power is re-applied, the run operation of inverter will be based on the
setting value of 00- 02(or 00- 03), 07- 04 and the status of power and operation
switch(FWD/REVswitch)(and 07- 00/07- 01/07- 02):
(1) If the parameter 00-02(or 00- 03)=0, inverter will not start automatically
when the power in re-applied.
(2) If the parameter 00- 02(or 00- 03)=1 and the power or operation switch is
open, inverter will not start automatically when the power is re-applied.
(3) If 00- 02(or 00- 03)=1, then power and operation switch are open
(07- 04=0), inverter will restart automatically when the power is re-applied.
For the safety, please turn off the power and operation switch after powered
off.
For the safety, please read the function explanation from the manual.
1.3 Before Operation
Caution
Make sure the inverter model and rating are the same as that set in parameter
13-00.

Table of Contents

Other manuals for TECO E510s Series

Related product manuals