MA365 • Rev. A2 23
Tellabs
®
6325 Edge Node 2 Installation Information
Labels on modules The modules are provided with identification labels as shown in the figure be-
low.
2.3 Physical Placement
Placement rules The Tellabs 6325 node is designed to operate in a typical commercial environ-
ment. Please observe the following rules:
• In case of AC powering, use a grounded, three-pronged power outlet ap-
proved by the electrical code of the region.
• Location must be clean, dust free and well ventilated.
• Do not cover ventilation holes.