EasyManua.ls Logo

Terex TA9 - Delivery Checks; Articulation Lock

Terex TA9
130 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4-1 TA9 & TA10 Dumper 0803-3 December 2010
Installation
Delivery Checks
Immediately on taking delivery of your new dumper and before
putting it into service:
Read this handbook completely -- it could save a great deal
of unnecessary expense. Put this Instruction Manual in its
holder (A) on the back of the seat.
Read the engine handbook supplied with the dumper.
Check general condition of the machine, - has it been
damaged during delivery?
Raise ROPS and install all pins and locking rings.
Fit flashing beacon to ROPS.
Check fluid levels - see Pre Start Checks on page 4-2.
Articulation Lock
If the machine has been delivered by lorry or trailer the
articulation lock (B) may have been fitted. This must be
released before the machine is used. Failure to release the
articulation lock will make the steering inoperative and cause
serious damage to the machine.
A
A
0803-2-001
B
0515-055

Table of Contents

Other manuals for Terex TA9

Related product manuals