Ultra Tugger
®
10 Cable Puller and Pulling Packages
Greenlee / A Textron Company 4455 Boeing Dr. • Rockford, IL 61109-2988 USA • 815-397-7070
36
Requires: A concrete oor with the following
characteristics:
Fully cured structural-type concrete
Minimum compressive strength of 211 kg/cm
2
(3000 psi)
Free of cracks, crumbling, or patchwork
Follow all oor mounting instructions carefully.
An improperly attached oor mount can come
loose and strike nearby personnel.
Do not attach the oor mount to masonry, brick,
or cinder block. These materials will not hold the
anchors securely.
Failure to observe this warning could result in severe
injury or death.
1. Determine the best position for locating the oor
mount. Locate the oor mount:
on a at section
at least 152 mm (6") from edge of concrete
as close to the conduit as possible to reduce the
amount of exposed rope under tension
so that the pull rope will approach the puller’s
capstan at a 90° (±5°) angle.
at least
152 mm (6")
at least
152 mm (6")
at least
152 mm (6")
90°
2. Set the oor mount in the desired location. Use the
oor mount as a template to drill four 5/8" holes at
least 152 mm (6") deep.
Note: Use a 5/8" carbide-tipped masonry bit
manufactured in accordance with ANSI standard
B94.12-77.
3. Vacuum the debris from the holes.
Installation
Greenlee recommends using Greenlee 35607 Wedge
Anchors. If another type of anchor is used, they must
have an ICBO (International Conference of Building
Ofcials) allowable tension and shear rating of 10.7 kN
(2400 lb) in 211 kg/cm2 (3000 psi) concrete.
1. Assemble the nut and washer to the anchor so the
top of the nut is ush with the top of the anchor,
as shown.
Top of
Anchor
Nut
Washer
2. Insert the four anchors through the oor mount and
into the holes in the oor.
3. Hammer the anchors in until the washer is in rm
contact with the oor mount.
4. Expand the anchors by torquing the nuts to 122 to
128 Nm (90 to 95 ft-lb).
If any of the four anchors spin before the minimum
torque is achieved, abandon the location and start
elsewhere. An improperly installed anchor can allow
the puller to break loose.
Failure to observe this warning could result in severe
injury or death.
5. Have the installation checked by a qualied
inspector.
Setup—Floor Mount

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Textron Greenlee UT10 and is the answer not in the manual?

Textron Greenlee UT10 Specifications

General IconGeneral
BrandTextron
ModelGreenlee UT10
CategoryPower Tool
LanguageEnglish

Related product manuals