EasyManua.ls Logo

Toro 74950 - Mower Deck Maintenance; Leveling the Mower Deck; Setting up the Machine

Toro 74950
68 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
G008968
1
2
Figure86
BottomViewofMachine
1.Filterlocations
2.Hydrauliclter
6.Applyathincoatofhydraulicoiltotherubbergasket
onthereplacementlter(Figure86).
7.Installthereplacementhydrauliclter.
8.Installthepump-drivebeltandthemowerbelt.
9.Removethejackstandsandlowerthemachine(Figure
85).
10.Addoiltothehydraulicreservoirandcheckforany
leaks.
11.Cleanupanyspilledoil.
12.Starttheengineandletitrunforabout2minutesto
purgeairfromthesystem.Shutofftheengineand
checkforleaks.
13.Checktheoillevelwhiletheoiliscold.
14.Ifrequired,addoiltothehydraulicreservoir.
Important:Donotoverll.
MowerDeck
Maintenance
LevelingtheMowerDeck
SettinguptheMachine
Note:Ensurethatthemowerdeckislevelbeforematching
theheightofcut(HOC).
1.Positionthemachineonaatsurface.
2.Disengagetheblade-controlswitch(PTO),movethe
motion-controlleverstotheNEUTRAL-LOCKposition,
andsettheparkingbrake.
3.Shutofftheengine,removethekey,andwaitforall
movingpartstostopbeforeleavingtheoperating
position.
4.Checkthetirepressureofthedrivetires.Ifneeded,
adjustthepressureto90kPa(13psi)
5.Positionthemowertothe76mm(3inch)height-of-cut
position.
LevelingtheDeck
1.Positionthemoweronaatsurface.
2.Stopengine,waitforallmovingpartstostop,remove
thekey,andengageparkingbrake.
3.Checkthetirepressureinthedrivetiresandadjustif
necessary.
Note:Properinationpressurefortiresis90kPa
(13psi).
4.Positionthetransportlockinthelatchingposition.
5.Pushthedeck-liftpedalallthewayforwardandthe
deckwilllatchatthe14cm(5–1/2inch)TRANSPORT
position(Figure87).
55

Table of Contents

Related product manuals