EasyManua.ls Logo

Toro Spray Master Series - Page 47

Toro Spray Master Series
88 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1.Ifusingatrailer,connectittothetowingvehicle
andconnectthesafetychains.
2.Ifapplicable,connectthetrailerbrakes.
3.Lowertheramp.
4.Alignthemachinetotherampandlockthe
casterwheels;refertoCaster-LockPedal(page
13)
5.Backthemachineuptheramp(Figure57).
g312789
Figure57
1.Backthemachineupthe
ramp.
2.Walkthemachineforward
downtheramp.
6.Securethemachine;refertoSecuringthe
MachineforTransport(page47).
7.Ifyourmachinehasmaterialinthespreader
hopper,installthehoppercover
SecuringtheMachinefor
Transport
WARNING
Securingthemachineatanyupperframe
locationcouldcausetheparkingbraketonot
functionproperly,whichcouldcauseserious
injuryordeath.
Onlyusethefronttie-downlocationsatthe
lowerframetosecurethefrontofthemachine.
Onlyusethereartie-downlocationsatthe
backoftheframetosecurethebackofthe
machine.
Note:Refertothechemical-warning-product
label(s)beforetransportingthemachineandfollow
alllocal/state/federalrequirementsfortransporting
chemicals.
Note:Ensurethatthespreader-hoppercoverandthe
spraywandaresecurebeforetransporting.
1.Attheleftsideofthemachine,ensurethatthe
shutoffvalveforthesprayertankisclosedand
thedrainplugissecure.Attherightsideofthe
machine,ensurethatthepump-shutoffvalveis
closed.
2.Shutofftheengine,removethekey,andengage
theparkingbrake(s).
3.Blockthetires.
4.Usethetie-downpointsonthemachineto
securelybindthemachinetothetrailerortruck
withstraps,chains,cable,orropes(Figure58
andFigure59orFigure60).Refertolocal
regulationsfortrailerandtie-downrequirements.
g313488
Figure58
46-inchand52-inchmachinesshown
1.Fronttie-downpoints
g313489
Figure59
46-inchmachineshown
1.Reartie-downpoints
47

Table of Contents

Related product manuals