EasyManua.ls Logo

Toshiba RAS-B10J2KVG-E - Page 126

Toshiba RAS-B10J2KVG-E
137 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
No.
Part name
Procedures
Remarks
7
Compressor
1) Perform work of item 1 of 1 and 2, 3, 4, 5.
2) Extract refrigerant gas.
3) Remove the partition board.
(ST2TØ4 × 10L 3 pcs.)
4) Remove the sound-insulation material.
5) Remove terminal cover of the compressor, and
disconnect lead wire of the compressor from
the terminal.
6) Remove pipe connected to the compressor with
a burner.
7) Remove the fixing screw of the bottom plate
and heat exchanger. (ST2TØ4 × 10L 1 pc.)
8) Remove the fixing screw of the bottom plate
and valve fixing plate.
(ST2TØ4 × 10L 1 pc.)
9) Pull upward the refrigeration cycle.
8
Reactor
1) Perform work of item 1 of 2 and 3.
2) Remove screws fixing the reactors
(ST2TØ4 × 10L 2 pcs.)
Compressor
Reactor
10) Remove NUT (3 pcs. fixing the compressor to
the bottom plate.
FILE NO. SVM-19001
- 126 -

Table of Contents

Other manuals for Toshiba RAS-B10J2KVG-E

Related product manuals