EasyManua.ls Logo

Trane CGAM - Pump Package Motor Lifting

Trane CGAM
276 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
166 CG-SVX17D-EN
Maintenance
Pump Package Motor Lifting
20-70 Ton — Slant, V Frame Units
Attach block and tackle to lifting bracket which is attached to condenser from directly above
pump package, shown in Figure 100, p. 166.
Attach lifting cables around pump motor, or to pump motor hooks, where available.
80-130 Ton — W Frame Units
Remove louvered panels and center condenser box frame vertical support as shown in
Figure 101, p. 167.
Attach block and tackle to 3/8” x 16 lifting eyebolt which is located in the top of the condenser
box as shown in
Figure 101, p. 167.
Motor and pump must be separated and removed through opening created by removal of
loubered panels and vertical support.
Attach lifting cables to motor hooks to remove.
Figure 100.Pump lifting bracket—20-70 ton — Slant, V Frame
Pump Lifting Bracket

Table of Contents

Related product manuals