F4000 LCD Operator's Manual Document No: LT0117
Operating Instructions - System Functions
Page 6-2 19 April 2002 Issue 2.38
6.1 BATTERY TEST
6.1.1 FUNCTION
To initiate a test on the standby battery supply by applying a test load for one minute.
6.1.2 OPERATING SEQUENCE (LOCAL PANEL)
From any information display or base display press:
- The LCD displays "Testing battery. Press ACK to stop".
- The "CHGR/BATT FAULT" indicator turns ON rapid flashing to
indicate a battery test is in progress.
TO STOP THE BATTERY TEST WHEN RUNNING
- Press the "ACK" key.
IF THE TEST PASSES
- If after application of the test load for one minute, the battery
voltage is still within specification, then the test will terminate
and the LED indicator will turn OFF.
- The LCD displays "Battery test passed. Press ACK key".
- Press the "ACK" key to complete the test, and the LCD will
revert to its previous display.
IF THE TEST FAILS
- If during the test a battery low is detected, the test will
terminate and the "CHGR/BATT FAULT" LED indicator will
flash.
- The LCD displays "Battery test failed. Press ACK key".
- Press the "ACK" key to clear the display and flashing
"CHGR/BATT FLT" LED indicator.
6.1.3 OPERATING SEQUENCE – REMOTE PANEL
A prompt will be given requesting whether the local panel or a remote panel should be
tested. For the remote panel option a further prompt will be given for the SID of that panel.
Enter the SID of the remote panel to be tested. Then press:
To send the command to the remote panel.