EasyManua.ls Logo

TYM T1054 - Land Leveling Pattern

TYM T1054
204 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
-
4
WORK PROCEDURE
Moving direction Backward
Finish
A: Border
Start
(15) (11)
(9) (13)
A
(14)
(10)
(4)
(5)
(3)
(6)
(2)
(7)
(1)
(8)
(12)
995E003A
Turning:
(3) Land leveling pattern
The land leveling work may be
performed after crushing soil or
not.
The vehicle speed can be set
faster when performing the land
leveling work with soil crushed
already.
When working in a wet eld, ll
the eld with a sufcient amount
of water so that the trace of
plowing cannot be seen.
The border shown in the fig-
ure should be set a little narrow-
er than two times of one plowing
width.
Refer to the alternating returning
pattern for other details.

Table of Contents

Related product manuals