c03.fm
Planning a OpenScape Cordless IP System
Installing Base Stations
A31003-C1020-S100-03-7620, 12/2017
OpenScape Cordless IP V2, Service Documentation 57
3.5.6.2 Pole Mounting
Material required: one metal tightening strap (supplied loose).
1. Feed the metal tightening straps through the specially-provided holes in the
outer installation plate (see Figure 17).
Figure 17 Installation plate
2. Attach the installation plate to the mast at the required height with the metal
tightening strap. The mast used must be stable and wind-resistant.
Do not install the base station on steel masts.
3. Screw the outdoor housing to the installation plate using the two M6 screws
and the nuts.
4. Tighten the screws.
5. Connect the base station connection cable(s).
6. Secure the housing cover with the four screws.
3.5.6.3 Wall Mounting without Installation Plate
Material required: four wall anchors of 8 mm diameter.